|
|
| Product | Quantum (Rs. Cr) (SEBI) | Quantum (Rs. Cr) (Other FSR) | Long Term Rating | Short Term Rating | Regulated By |
| Bank Loan Ratings | 0.00 | 15.57 | ACUITE BB- | Reaffirmed & Withdrawn | Issuer not co-operating* | - | RBI |
| Bank Loan Ratings | 0.00 | 28.68 | ACUITE Not Applicable | Withdrawn | Issuer not co-operating* | - | RBI |
| Bank Loan Ratings | 0.00 | 12.00 | - | ACUITE A4+ | Reaffirmed & Withdrawn | Issuer not co-operating* | RBI |
| Total Outstanding | 0.00 | 0.00 | - | - | - |
| Total Withdrawn | 0.00 | 56.25 | - | - | - |
| * The issuer did not co-operate; based on best available information. | |||||
| Note:- For activities or ratings of instruments falling under the purview of Financial Sector Regulators other than SEBI, the grievance / dispute redressal mechanisms and investor protection mechanisms provided by SEBI shall not be available. |
|
Rating Rationale |
|
Acuité has reaffirmed and withdrawn its long-term rating of ‘ACUITE BB-’ (read as ACUITE double B minus) on the Rs.15.57 Cr. bank facilities and short-term rating of 'ACUITE A4+' (read as ACUITE A Four plus) on the Rs.12.00 Cr. bank facilities of SLC Projects Private Limited (SLCPPL). The rating has been withdrawn on account of the request received from the issuer and No objection certificate (NOC) received from the lender.
Further, Acuité has also withdrawn its rating on the proposed long-term bank facilities of Rs.28.68 Cr. of SLC Projects Private Limited (SLCPPL) without assigning any rating as it is a proposed facility. The rating has been withdrawn on account of the request received from the issuer. The rating withdrawal is in accordance with Acuite's policy of withdrawal of ratings as applicable to the respective instrument/facility. The rating is now being flagged as “Issuer Not Cooperating” and is based on the best available information. |
| About the Company |
|
Incorporated in 2005, SLC Projects Private Limited (SLCPPL) provides infrastructure construction and engineering services. The company is actively involved in construction, electrical, and mechanical works for government defence-related projects. The company is set up by Mr. P. Subbaraju and the company operates from Visakhapatnam, Andhra Pradesh.
|
| Unsupported Rating |
| Not applicable. |
| Non-cooperation by the issuer/borrower |
|
Acuité has been requesting for data, information and undertakings from the rated entity for conducting surveilance & review of the rating. However, the issuer/borrower failed to submit such information before the due date. Acuité believes that information risk is a critical component in such ratings, and non cooperation by the issuer along with unwilingness to provide information could be a sign of potential deterioration in its overal credit quality. This rating is, therefore, being flagged as “Issuer not-cooperating”, in line with prevailing SEBI regulations and Acuité’s policies.
|
| Limitation regarding information availability |
Rating Sensitivities
| Potential triggers (individual or collective) for an upward rating action: |
| Not Applicable |
| Potential triggers (individual or collective) for a downward rating action: |
| Not Applicable |
| Liquidity Position |
| No information provided by the issuer / available for Acuité to comment upon. |
| Outlook: Not Applicable |
| |
| Other Factors affecting Rating |
| None. |
| Particulars | Unit | FY 25 (Actual) | FY 24 (Actual) |
| Operating Income | Rs. Cr. | 100.44 | 102.05 |
| PAT | Rs. Cr. | 5.40 | 4.29 |
| PAT Margin | (%) | 5.38 | 4.21 |
| Total Debt/Tangible Net Worth | Times | 1.71 | 2.42 |
| PBDIT/Interest | Times | 2.32 | 2.28 |
| Status of non-cooperation with previous CRA |
| Not applicable. |
| Any other information |
| None. |
| Applicable Criteria |
|
• Application Of Financial Ratios And Adjustments: https://www.acuite.in/view-rating-criteria-53.htm • Default Recognition: https://www.acuite.in/view-rating-criteria-52.htm • Infrastructure Investment Trust (InvIT): https://www.acuite.in/view-rating-criteria-72.htm |
| Note on complexity levels of the rated instrument |
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||
| * The issuer did not co-operate; based on best available information. | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Note:- For activities or ratings of instruments falling under the purview of Financial Sector Regulators other than SEBI, the grievance / dispute redressal mechanisms and investor protection mechanisms provided by SEBI shall not be available. |
| |
Disclosure of list of non-cooperative issuers |
|
• Listed :- https://www.acuite.in/Non-Cooperative_Issuer_Listed.php • Unlisted :- https://www.acuite.in/Non-Cooperative_Issuer_Unlisted.php |
|
Contacts |
List of instruments and names of regulators of the instruments |
| © Acuité Ratings & Research Limited. All Rights Reserved. | www.acuite.in |
